A roofing estimate step by step Per Square Pricing mode
For step by step using detail pricing go here.
Roof Pitch 4/12 Measured from the ground as per take-off
(below).
If our measurements were taken from the roof we would not add for pitch.
We will use roll starter on rakes, this will be add the additional rolls of
starter needed for your roofing estimate.
We have set in Options to round our total prices up
to the next full dollar.
We will not add waste for the hips, valleys or rakes.
We will not add ridge and rakes to our total squares.
See how total squares are totaled.
Job Info:
John Doe
1124 Oak Rock Way
Reno, Nevada 35874 JohnDoe@GMail.com
Home 547-214-4475 W 358-2254
Enter the above name and information like this:

Check the add pitch box and select 4/12 pitch :
.05 will be added for roof pitch.
Select Per square pricing:
See per square pricing vs Detail Pricing.
Type 95 into the divisor column in the Job Cost Grid:
This will add 5% for waste.
Select the Roof Area Option, then start entering your roof
area numbers:
after you have entered your roof area numbers select the hip option, then enter
all your your hip measurements, continue to Top Ridge, Rakes or (Gables), Eaves
and valleys. Tip (Pressing enter after each number moves the cursor
between the boxes)

Your number details: Compare this to your actual numbers
from above. Click this icon to open: 

Your totals, Click this toolbar button to open: 

Next for simplicity we will enter 100 in the Bid price per
square.
For Extras 100.00
Optional price per square 200.00

Click the save button on the toolbar and you have a saved estimate.
Now you have a saved estimate for 35yr and 50 year comp.
The name and contact information has been saved to your
address book.
Click the map toolbar button and get an online map to the address you have
entered.
Click the email button and send these prices by email.

Click this button and create a work order Read
about creating a work order.
If you are using Roofcalculator combined with Classy
Writer you could also create a Roofing Proposal, Invoice, Change Order, Certification
or Letter.
We could have added these options:
Rounding total squares.
Rounding material units.
Waste for valleys, hips and rakes.
We did not add these options:
Ridge on rakes.
Add ridge and starter to
our total squares.
|